  • What size bolt should be used for cable trays

    What size bolt should be used for cable trays

    The cable trays are fastened to the cantilever brackets with 2 mushroom head bolts (FLM 6X12/FLM 6X16 F). The exceptions to this are vertical bends. The cable support lengths and fittings can basically be designed as cable trays, cable ladders or mesh cable trays, in which cables are routed. Fittings can, on the one hand, be used for horizontal or vertical changing of the routing direction or, on the other, to change the height or width of the. maintain spacing or to keep cables in place when the tray is ect the minimum bend ra-dius for cables as they exit the bottom of the cable tray. TKS pendant brackets up to a length of 900 mm and TKS 150 to TKS 350 brackets or TKS 100 to TKS 300 brackets with KAWG 12 bracket. The screw-on cable tray systems fulfil the requirements of “IEC 61537:2006 – Cable management ‒ Cable tray systems and cable ladder systems” for the low voltage area.

    [PDF Version]
  • What size transformer requires relay protection

    What size transformer requires relay protection

    Fuses may adequately protect small transformers, but larger ones require overcurrent protection using a relay and CB, as fuses do not have the required fault breaking capacity. Under normal conditions, these currents balance. If the difference exceeds a threshold, it indicates an internal fault, and the relay trips the circuit breaker. It is the most sensitive protection for internal winding. Transformer protection is crucial as transformers are one of the most critical and expensive components of any distribution system. Setting procedures are only discussed in a general nature in the material to follow.


  • What size grounding wire is typically used in industrial switches

    What size grounding wire is typically used in industrial switches

    122 is the primary reference for determining the minimum size of equipment grounding conductors based on the rating of the overcurrent protection device. The National Electrical Code (NEC) provides clear guidelines for ground wire sizing through Table 250. 122, but understanding how to apply these requirements correctly can make the difference between a safe installation and a costly code violation. The sizing of the EGC is governed by Article 250.


  • Factors Affecting Network Cabinet Size

    Factors Affecting Network Cabinet Size

    The right Network Cabinet size is determined by three key factors: total rack units (U) required, equipment depth, and future expansion capacity. In most business environments, choosing a cabinet with at least 20–30% extra rack space prevents overcrowding and extends system. In this guide, we'll walk you through everything you need to know about home networking cabinet sizes, from basic measurements to advanced selection strategies. By the end, you'll have the confidence to choose the perfect cabinet for any project. Section 1: What Does 'U' Mean in Network Cabinets? Let's start with the basics. The letter “U” stands for something called a rack unit. In this article, we will provide a guide to help you select the right. This report provides a comprehensive analysis of network cabinet sizes, focusing on industry standards, emerging trends, and specific product segments including enterprise-grade racks and compact wall-mount solutions.

    [PDF Version]
  • Controlling the size of the small busbar

    Controlling the size of the small busbar

    The smallest passing busbar size will be selected automatically. The busbar sizing calculator determines the required busbar dimensions based on the continuous current rating, short circuit withstand, and thermal limits for switchgear assemblies. 2 A/mm² for conservative / high‑temperature designs. You can select, say, 2×50×6 mm. Bus bars are the essential components in the electrical distribution systems (EDB) serving as primary conductors that carry current between 1). The current rating is calculated from the conductor. Busbar Length (m):Length of the busbar for voltage drop and power loss calculations. Always verify with specific standards and manufacturer data. Selecting material: Select Copper or Aluminum from the.

    [PDF Version]
  • Drilling holes in the distribution box to lead out wires

    Drilling holes in the distribution box to lead out wires

    Drilling a hole in a junction box can have unforeseen consequences for existing wiring and connected devices. A misplaced drill bit could easily damage or sever wires within the junction box. However, it's essential to understand the implications and potential risks involved.


More industry information

Contact Us

We Look Forward to Working with You

Contact Information

Phone +27 82 415 6793
Address Unit 7, Innovation Park, 34 Electron Road, Kempton Park, 1620, South Africa

Send an Inquiry